Completed projects

Construction of the hotel complex "GOOD ZONE Club" in ZATOKA village of Odesa region

Construction time: April 15, 2009 - June 16, 2010
Address of the object: Ukraine, Odesa region, Zatoka village, Golden Beach Boulevard, 11
Area of ​​the facility: 8,000 sq.m.
Taking into account the specifics of the tasks set by the Customer, taking into account the "field conditions" of construction and strict deadlines limited to the period of one "construction season", as well as taking into account the specifics of the purpose of the object and its location, the company made a decision to apply frame construction technology in therefore, the following works were carried out:

- works on the construction of strip foundations of buildings;
- backfilling and waterproofing works;
- installation of supporting elements of facade galvanized panels;
- installation of galvanized profile panels;
- effective insulation of panel cavities with mineral wool;
- construction of wind- and waterproof carpets with effective facade insulation;
- decoration of the facade with the Knauf Aquapanel system.

Reconstruction of the "Vuzovsky" Business Center in Odessa

Construction period: 2012-2014.
Address of the object: Ukraine, Odesa, Lustdorfska doroga, 140-А.
Area of ​​the facility: 13,000 sq.m.
Considering that the business center remained operational during the construction period, as well as taking into account the specifics of the tasks set by the Customer to increase the area of ​​the object by adding additional floors, taking into account the initial load-bearing capacity of the existing foundation, during the reconstruction of the object, the company also applied technology frame construction and the following related works were carried out:

- reinforcement of reinforced concrete elements of the building;
- dismantling of the roof;
- dismantling of facade fencing structures;;
- arrangement of the load-bearing metal frame of surfaces that are superimposed from rolled metal (columns, beams, crossbars);
- installation of supporting elements of facade galvanized panels;
- installation of galvanized profile panels;
- effective insulation of panel cavities with mineral wool;
- construction of wind- and waterproof materials with efficient facade insulation;
- decoration of the facade with composite materials.

Reconstruction of the Business Center on Str.

Time of construction: 2013-2014.
Object address: Ukraine, Odesa, st.
Area of ​​the object: 3300 sq.m.
Considering that the business center remained operational during the construction period, as well as taking into account the specifics of the tasks set by the Customer to increase the area of ​​the object by adding additional floors, taking into account the initial load-bearing capacity of the existing foundation, during the reconstruction of the object, the company also applied technology frame construction and the following related works were carried out:

- reinforcement of reinforced concrete elements of the building;
- dismantling of the roof;
- dismantling of facade fencing structures;
- arrangement of the load-bearing metal frame of surfaces that are superimposed from rolled metal (columns, beams, crossbars);
- installation of supporting elements of facade galvanized panels;
- installation of galvanized profile panels;
- effective insulation of panel cavities with mineral wool;
- construction of wind- and waterproof materials with efficient facade insulation;
- decoration of the facade with composite materials.

The construction of the SUN City VIP-class Hotel Apartments in Odesa.

Construction time: November 2013 - May 2014.
Object address: Ukraine, Odesa, st. Posmitny, 10/12.
Area of ​​the facility: 724 sq.m.
During the construction of this object, the company also applied frame construction technology and carried out the following works:

- works on the construction of strip foundations of buildings;
- backfilling and waterproofing works;
- installation of supporting elements of facade galvanized panels;
- installation of galvanized profile panels;
- effective insulation of panel cavities with mineral wool;
- arrangement of wind- and water-proof materials with efficient facade insulation.

The reconstruction of the hotel complex "IL DECAMERON" in Odesa on the street Lekha Kaczynskogo,10.

Total area: 4,125 sq.m.
Difficulty category: IV category.
Status: General contractor